Saturday, September 30, 2017
Friday, September 29, 2017
Thursday, September 28, 2017
Wednesday, September 27, 2017
Iron Goat Trail Hike: first Cascade Tunnel
The western portal of the first Cascade Tunnel is at the east end of the Iron Goat Trail. The 2.6 mile long tunnel was completed in 1900 and used by the Great Northern Railway until 1929. The company had decided in the mid-1920s to build a new tunnel at a lower elevation to avoid the harsh winter snow. The western portal of the second Cascade Tunnel is shown below, as seen from the Iron Goat Trail. It was completed in 1929 and is 7.8 miles long.
Tuesday, September 26, 2017
Monday, September 25, 2017
Iron Goat Trail Hike: trail views
Much of the trail followed along the side of tall snow barriers. This part of the trail is relatively flat, gaining only 300 feet in over two miles.Mileposts indicate the distance from St. Paul, Minnesota.
We passed by this collapsed wooden show shed. It had been built in 1910 and was left when the line was abandoned in 1929.
The wild flowers were beautiful. Some of the path was overgrown and we fought stinging nettles.
Sunday, September 24, 2017
Subscribe to:
Posts (Atom)


















